Triple

T26325386
Position Surface form Disambiguated ID Type / Status
Subject Cieszyn Silesia dispute E662237 entity
Predicate concernsInfrastructure P54339 FINISHED
Object Košice–Bohumín Railway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Košice–Bohumín Railway | Statement: [Cieszyn Silesia dispute, concernsInfrastructure, Košice–Bohumín Railway]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: concernsInfrastructure
Context triple: [Cieszyn Silesia dispute, concernsInfrastructure, Košice–Bohumín Railway]
  • A. hasInfrastructureConcern
    Indicates that an entity has a problem, risk, or issue related to infrastructure that requires attention or management.
  • B. relatedInfrastructure
    Indicates that one piece of infrastructure is connected, associated, or functionally related to another infrastructure element.
  • C. infrastructureNeed
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • D. infrastructureFocusArea
    Indicates the specific aspect or domain of infrastructure that an entity, project, or activity is primarily concerned with or directed toward.
  • E. infrastructureImpact chosen
    Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee812f32748190871d970c4e2a8ddf completed April 26, 2026, 9:18 p.m.
NER Named-entity recognition batch_69f65aa07c048190a5df30d53d8f0cf5 completed May 2, 2026, 8:12 p.m.
PD Predicate disambiguation batch_69f659cc571c819097e51e531961d812 completed May 2, 2026, 8:08 p.m.
Created at: April 26, 2026, 10:30 p.m.