Triple
T26305186
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Asterope II |
E661661
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | main sequence star |
C51401
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: main sequence star Context triple: [Asterope II, instanceOf, main sequence star]
-
A.
M-type main-sequence star
An M-type main-sequence star is a small, cool, red dwarf star that fuses hydrogen in its core and emits relatively low luminosity compared to hotter, more massive stars.
-
B.
B-type main-sequence star
A B-type main-sequence star is a hot, massive, blue-white star fusing hydrogen in its core, characterized by strong helium lines and high luminosity.
-
C.
A-type main-sequence star
An A-type main-sequence star is a hot, white or bluish-white hydrogen-fusing star with strong hydrogen absorption lines and a surface temperature typically between about 7,500 and 10,000 K.
-
D.
subgiant star
A subgiant star is a stellar object that has exhausted hydrogen in its core and is transitioning off the main sequence, expanding and cooling as it begins to burn hydrogen in a surrounding shell.
-
E.
pre-main-sequence star
A pre-main-sequence star is a young, contracting protostellar object that has not yet initiated stable hydrogen fusion in its core and is evolving toward the main sequence.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee812dacfc81908484aade9120fba9 |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 10:18 p.m.