Triple
T26279360
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | House Report No. 95-1828 |
E660661
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | final report |
C23989
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: final report Context triple: [House Report No. 95-1828, instanceOf, final report]
-
A.
current report
A current report is a concise, up-to-date document that summarizes the most recent data, events, or status of an ongoing situation for timely review and decision-making.
-
B.
concluding document
chosen
A concluding document is a final written record that summarizes outcomes, decisions, and next steps at the end of a process, project, or agreement.
-
C.
analytical report
An analytical report is a structured document that examines data or information in depth to interpret findings, draw conclusions, and often recommend actions based on evidence.
-
D.
final act
The "final act" is the concluding segment of a narrative, performance, or process in which remaining conflicts are resolved and the ultimate outcome is revealed.
-
E.
institutional report
An institutional report is a formal document that presents structured information, analysis, and findings about an organization’s activities, performance, or compliance to internal or external stakeholders.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee812960d081909cff6085cc9fa3a6 |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 9:58 p.m.