Triple
T26277748
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | London Gatwick – Rio de Janeiro |
E660620
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | intercontinental route |
C25851
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: intercontinental route Context triple: [London Gatwick – Rio de Janeiro, instanceOf, intercontinental route]
-
A.
international air route
chosen
An international air route is a designated flight path that connects airports in different countries, governed by bilateral or multilateral agreements and aviation regulations.
-
B.
international road
An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
-
C.
transcontinental automobile route
A transcontinental automobile route is a long-distance roadway or network of connected highways that enables continuous vehicular travel across an entire continent from one coast or border to another.
-
D.
regional air route
A regional air route is a defined flight path connecting airports within a specific geographic area, typically served by short- to medium-haul aircraft to facilitate local or intra-regional air travel.
-
E.
international railway
An international railway is a rail transport system or route that connects and facilitates the movement of passengers and freight between two or more countries across their national borders.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee812960d081909cff6085cc9fa3a6 |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 9:57 p.m.