Triple

T26276057
Position Surface form Disambiguated ID Type / Status
Subject Durg–Bhilai–Raipur urban corridor E660572 entity
Predicate instanceOf P0 FINISHED
Object industrial belt C51356 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industrial belt
Context triple: [Durg–Bhilai–Raipur urban corridor, instanceOf, industrial belt]
  • A. industrial district
    An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
  • B. industrial center
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • C. industrial town
    An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
  • D. coastal industrial area
    A coastal industrial area is a shoreline zone dominated by factories, ports, warehouses, and related infrastructure that support manufacturing, shipping, and other large-scale economic activities.
  • E. industrial park
    An industrial park is a planned and zoned area of land designated for industrial development, typically providing shared infrastructure, utilities, and transportation access for manufacturing, warehousing, and related businesses.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee812960d081909cff6085cc9fa3a6 completed April 26, 2026, 9:18 p.m.
Created at: April 26, 2026, 9:55 p.m.