Triple

T26261101
Position Surface form Disambiguated ID Type / Status
Subject Epping (1959) E656848 entity
Predicate instanceOf P0 FINISHED
Object railway infrastructure upgrade C17897 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway infrastructure upgrade
Context triple: [Epping (1959), instanceOf, railway infrastructure upgrade]
  • A. railway modernisation project chosen
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • B. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • C. rail transportation infrastructure
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • D. commuter rail infrastructure
    Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b4e21bc819082be98bc9ab09796 completed April 26, 2026, 6:37 p.m.
Created at: April 26, 2026, 9:10 p.m.