Triple

T26226149
Position Surface form Disambiguated ID Type / Status
Subject Jal Marg Vikas Project E655897 entity
Predicate instanceOf P0 FINISHED
Object inland waterways project C26460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: inland waterways project
Context triple: [Jal Marg Vikas Project, instanceOf, inland waterways project]
  • A. waterway navigation system
    A waterway navigation system is an integrated set of tools, sensors, and software that provides real-time guidance, routing, and safety information for vessels traveling on rivers, canals, and other inland or coastal waterways.
  • B. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • C. inland waterway vessel
    An inland waterway vessel is a ship or boat specifically designed and equipped for transporting goods or passengers on rivers, canals, lakes, and other sheltered inland waters.
  • D. engineered waterway chosen
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • E. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b4a77e08190bfcb5f8ecdc55abd completed April 26, 2026, 6:36 p.m.
Created at: April 26, 2026, 8:58 p.m.