Triple

T26194555
Position Surface form Disambiguated ID Type / Status
Subject Banpo Bridge Rainbow Fountain E655061 entity
Predicate instanceOf P0 FINISHED
Object outdoor light show C39150 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: outdoor light show
Context triple: [Banpo Bridge Rainbow Fountain, instanceOf, outdoor light show]
  • A. nighttime spectacular
    A nighttime spectacular is a large-scale, choreographed evening entertainment show that combines elements like fireworks, lighting, music, projections, and special effects to create an immersive visual and auditory experience.
  • B. drive-through light show
    A drive-through light show is an immersive, vehicle-based experience where visitors follow a designated route to view large-scale, synchronized holiday or themed light displays, often set to music.
  • C. outdoor lighting fixture
    An outdoor lighting fixture is a weather-resistant device designed to illuminate exterior spaces such as yards, pathways, and building facades for safety, security, and aesthetic purposes.
  • D. solar-powered light installation
    A solar-powered light installation is an artistic or functional lighting system that harnesses sunlight via photovoltaic panels, stores the energy, and automatically illuminates spaces without relying on external power sources.
  • E. light installation chosen
    A light installation is an artistic arrangement of lighting elements in a space to create a specific visual, atmospheric, or experiential effect.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b48236c81908fe385b6afc4f60b completed April 26, 2026, 6:36 p.m.
Created at: April 26, 2026, 8:45 p.m.