Triple

T26184568
Position Surface form Disambiguated ID Type / Status
Subject HMAS Adelaide (L01) E654789 entity
Predicate instanceOf P0 FINISHED
Object Canberra-class landing helicopter dock C51208 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Canberra-class landing helicopter dock
Context triple: [HMAS Adelaide (L01), instanceOf, Canberra-class landing helicopter dock]
  • A. Anzac-class frigate
    The Anzac-class frigate is a class of modern, multi-role warships operated by the Royal Australian Navy and Royal New Zealand Navy, designed primarily for anti-submarine and anti-surface warfare, as well as air defense and patrol duties.
  • B. Hobart-class destroyer
    The Hobart-class destroyer is a class of advanced air warfare destroyers operated by the Royal Australian Navy, designed for long-range air defense, surface and subsurface warfare, and fleet protection using the Aegis combat system.
  • C. Adelaide-class guided missile frigate
    The Adelaide-class guided missile frigate is a class of Royal Australian Navy warships based on the U.S. Oliver Hazard Perry design, equipped with advanced radar, anti-air, anti-surface, and anti-submarine systems for multi-role maritime operations.
  • D. Type 26 frigate
    The Type 26 frigate is a modern, multi-mission Royal Navy warship designed primarily for anti-submarine warfare, while also capable of air defense, surface warfare, and humanitarian operations.
  • E. Fiji-class light cruiser
    The Fiji-class light cruiser was a group of British Royal Navy warships built just before and during World War II, designed as compact yet heavily armed cruisers optimized for fleet screening, trade protection, and anti-aircraft defense within treaty limitations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b469bc081908fe486453fdad810 completed April 26, 2026, 6:36 p.m.
Created at: April 26, 2026, 8:41 p.m.