Triple

T2617984
Position Surface form Disambiguated ID Type / Status
Subject Third System of US seacoast defense E58935 entity
Predicate instanceOf P0 FINISHED
Object coastal fortification program C876 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal fortification program
Context triple: [Third System of US seacoast defense, instanceOf, coastal fortification program]
  • A. military fortification system chosen
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • B. line of fortifications
    A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
  • C. historic coastal fort
    A historic coastal fort is a fortified structure built along a shoreline to defend strategic waterways and harbors from naval threats, often featuring thick masonry walls, artillery emplacements, and commanding views of the sea.
  • D. border defense system
    A border defense system is an integrated network of physical barriers, surveillance technologies, personnel, and response protocols designed to monitor, control, and protect a nation's boundaries from unauthorized crossings and external threats.
  • E. sea fort
    A sea fort is a fortified structure built on or near the sea, typically on artificial islands, rocks, or coastal waters, designed to defend harbors, coastlines, or strategic maritime routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac444dc819099614e534dd6021f completed March 6, 2026, 9:44 p.m.
Created at: March 6, 2026, 9:50 p.m.