Triple

T26155209
Position Surface form Disambiguated ID Type / Status
Subject Sydney underground railway (City Circle) plan E659938 entity
Predicate instanceOf P0 FINISHED
Object urban transport plan C27321 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban transport plan
Context triple: [Sydney underground railway (City Circle) plan, instanceOf, urban transport plan]
  • A. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • B. public transit plan chosen
    A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
  • C. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • D. urban transit technology
    Urban transit technology encompasses the systems, vehicles, infrastructure, and digital tools that enable efficient, safe, and sustainable movement of people within cities.
  • E. short-range transportation plan
    A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bc5a9908190899d39ce95c6d215 completed April 26, 2026, 6:39 p.m.
Created at: April 26, 2026, 8:27 p.m.