Triple
T26155209
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sydney underground railway (City Circle) plan |
E659938
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban transport plan |
C27321
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban transport plan Context triple: [Sydney underground railway (City Circle) plan, instanceOf, urban transport plan]
-
A.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
B.
public transit plan
chosen
A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
urban transit technology
Urban transit technology encompasses the systems, vehicles, infrastructure, and digital tools that enable efficient, safe, and sustainable movement of people within cities.
-
E.
short-range transportation plan
A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bc5a9908190899d39ce95c6d215 |
completed | April 26, 2026, 6:39 p.m. |
Created at: April 26, 2026, 8:27 p.m.