Triple

T26145619
Position Surface form Disambiguated ID Type / Status
Subject Hindustan Motors E659653 entity
Predicate ambassadorProductionEnded P4160 FINISHED
Object 2014 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2014 | Statement: [Hindustan Motors, ambassadorProductionEnded, 2014]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: ambassadorProductionEnded
Context triple: [Hindustan Motors, ambassadorProductionEnded, 2014]
  • A. productionEnd chosen
    Indicates that a production process, activity, or run has come to its completion or final stopping point.
  • B. currentAmbassador
    Indicates that one entity currently serves as the official ambassador representing another entity.
  • C. campaignEndedWith
    Indicates that a particular campaign has concluded and specifies the event, condition, or outcome with which it ended.
  • D. sponsorshipEndedWith
    Indicates that a previously existing sponsorship relationship between entities has come to an end.
  • E. sponsorshipEnded
    Indicates that a previously existing sponsorship relationship between entities has been terminated or has come to an end.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bc496a88190af7deb7ab5e081de completed April 26, 2026, 6:39 p.m.
NER Named-entity recognition batch_69f60be803c88190980a8aafa935a52b completed May 2, 2026, 2:36 p.m.
PD Predicate disambiguation batch_69f5b0021da88190bdd4cf2698c23edf completed May 2, 2026, 8:04 a.m.
Created at: April 26, 2026, 8:22 p.m.