Triple

T26145613
Position Surface form Disambiguated ID Type / Status
Subject Hindustan Motors E659653 entity
Predicate majorPlantState P177507 FINISHED
Object West Bengal NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: West Bengal | Statement: [Hindustan Motors, majorPlantState, West Bengal]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: majorPlantState
Context triple: [Hindustan Motors, majorPlantState, West Bengal]
  • A. mainPlantState
    Indicates the current operational status or condition of the primary plant or facility in the system.
  • B. hasMajorPlant
    Indicates that one entity possesses or hosts a primary or most significant plant facility or installation in relation to another entity.
  • C. operatorOfMajorPlant
    Indicates that an entity operates or manages a major industrial or production plant.
  • D. involvesPlant
    Indicates that the relationship or action includes or pertains to a plant as a participating entity.
  • E. plantActivity
    Indicates an action, process, or behavior being carried out by a plant or involving plant-related functions.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bc496a88190af7deb7ab5e081de completed April 26, 2026, 6:39 p.m.
NER Named-entity recognition batch_69f7009d39508190af7301f824615e88 completed May 3, 2026, 8 a.m.
PD Predicate disambiguation batch_69f6fc53f4f881908dcc698687bbb64d completed May 3, 2026, 7:42 a.m.
PDg Predicate description generation batch_69f6ffb7554881908993d6d2ffbcf8f5 completed May 3, 2026, 7:56 a.m.
Created at: April 26, 2026, 8:22 p.m.