Triple
T26133945
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1962 Asian Games |
E659322
|
entity |
| Predicate | cityInfrastructureImpact |
P133158
|
FINISHED |
| Object | accelerated urban development in Jakarta |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: accelerated urban development in Jakarta | Statement: [1962 Asian Games, cityInfrastructureImpact, accelerated urban development in Jakarta]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: cityInfrastructureImpact Context triple: [1962 Asian Games, cityInfrastructureImpact, accelerated urban development in Jakarta]
-
A.
infrastructureImpact
Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
-
B.
impactOnUrbanAreas
chosen
Indicates the effect or influence that something has on cities or densely populated urban environments.
-
C.
cityRegulationImpact
Indicates how a specific city regulation affects or influences certain activities, entities, or conditions.
-
D.
transportationImpact
Indicates how one entity’s transportation-related activities or characteristics affect another entity or the surrounding environment.
-
E.
infrastructureDamage
Indicates damage or destruction affecting physical infrastructure such as buildings, roads, utilities, or other constructed facilities.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bc3c20c8190bf2cf272f4170e95 |
completed | April 26, 2026, 6:38 p.m. |
| NER | Named-entity recognition | batch_69f60b950b1881909accde0c8547369f |
completed | May 2, 2026, 2:35 p.m. |
| PD | Predicate disambiguation | batch_69f5b0021da88190bdd4cf2698c23edf |
completed | May 2, 2026, 8:04 a.m. |
Created at: April 26, 2026, 8:16 p.m.