Triple

T26126361
Position Surface form Disambiguated ID Type / Status
Subject Assam Combined Entrance Examination E659116 entity
Predicate instanceOf P0 FINISHED
Object state-level competitive exam C1372 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: state-level competitive exam
Context triple: [Assam Combined Entrance Examination, instanceOf, state-level competitive exam]
  • A. state championship
    A state championship is a high-level competition that determines the best individual or team in a particular sport or activity within a specific state.
  • B. standardized exam chosen
    A standardized exam is a formal test administered and scored in a consistent, uniform manner to measure individuals’ knowledge, skills, or aptitude against common criteria.
  • C. national competition
    A national competition is a large-scale contest in which individuals or teams from across an entire country compete under standardized rules to determine top performers or champions in a specific field.
  • D. state-level court
    A state-level court is a judicial body within a specific U.S. state that interprets and applies state laws, resolves disputes, and administers justice under that state's legal system.
  • E. statewide testing program
    A statewide testing program is a coordinated system of standardized assessments implemented across an entire state to measure student performance, monitor educational outcomes, and inform policy and instructional decisions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bc2b2948190b458ad3f580af779 completed April 26, 2026, 6:38 p.m.
Created at: April 26, 2026, 8:12 p.m.