Triple

T26126360
Position Surface form Disambiguated ID Type / Status
Subject Assam Combined Entrance Examination E659116 entity
Predicate instanceOf P0 FINISHED
Object engineering entrance exam C1466 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering entrance exam
Context triple: [Assam Combined Entrance Examination, instanceOf, engineering entrance exam]
  • A. engineering examination chosen
    An engineering examination is a formal assessment that evaluates a candidate’s understanding and application of engineering principles, problem-solving skills, and technical knowledge within a specific engineering discipline.
  • B. engineering licensure exam
    An engineering licensure exam is a standardized professional test that assesses whether an engineer possesses the minimum competency, knowledge, and ethical understanding required to practice engineering independently and legally within a specific jurisdiction.
  • C. defence entrance examination
    A defence entrance examination is a standardized test used to assess candidates' eligibility, aptitude, and suitability for admission into military or defence-related training institutions or services.
  • D. engineering institute
    An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
  • E. graduate admissions test
    A graduate admissions test is a standardized examination used by universities to assess applicants’ academic readiness, skills, and potential for success in advanced degree programs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bc2b2948190b458ad3f580af779 completed April 26, 2026, 6:38 p.m.
Created at: April 26, 2026, 8:12 p.m.