Triple
T26098269
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CIT Equipment Finance |
E658331
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | equipment finance company |
C46259
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: equipment finance company Context triple: [CIT Equipment Finance, instanceOf, equipment finance company]
-
A.
aircraft leasing company
An aircraft leasing company is a business that purchases aircraft and leases them to airlines or other operators, managing financing, contracts, and often maintenance arrangements to optimize fleet utilization and investment returns.
-
B.
asset-based finance company
chosen
An asset-based finance company is a financial institution that provides loans or credit facilities secured by a borrower’s assets, such as inventory, accounts receivable, equipment, or real estate, rather than primarily on creditworthiness.
-
C.
rolling stock leasing company
A rolling stock leasing company owns and maintains railway vehicles such as locomotives and carriages, which it rents to train operators under various contractual arrangements.
-
D.
infrastructure finance company
An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
-
E.
facility management company
A facility management company is an organization that plans, operates, and maintains buildings and their services to ensure safe, efficient, and cost-effective environments for occupants and owners.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bc09c288190bc42a11972841383 |
completed | April 26, 2026, 6:38 p.m. |
Created at: April 26, 2026, 7:53 p.m.