Triple

T2605933
Position Surface form Disambiguated ID Type / Status
Subject Universal Credit E58657 entity
Predicate fullServiceRolloutCompleted P22986 FINISHED
Object 2018 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2018 | Statement: [Universal Credit, fullServiceRolloutCompleted, 2018]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: fullServiceRolloutCompleted
Context triple: [Universal Credit, fullServiceRolloutCompleted, 2018]
  • A. fullyOperationalBy
    Indicates that an entity is expected or required to be completely functional and ready for use no later than a specified time or event.
  • B. installationCompleted
    Indicates that the process of installing something has finished successfully.
  • C. declaredFullyOperationalBy
    Indicates that one entity has officially stated that another entity is completely ready and capable of functioning as intended.
  • D. conversionCompleted
    Indicates that a previously initiated conversion process has finished successfully.
  • E. isComplete chosen
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac3523881909679750c9f8c2dec completed March 6, 2026, 9:44 p.m.
NER Named-entity recognition batch_69abd8def9bc8190b2e013abffc7b191 completed March 7, 2026, 7:50 a.m.
PD Predicate disambiguation batch_69abd80ab7248190ba06ba14fe4c5638 completed March 7, 2026, 7:47 a.m.
Created at: March 6, 2026, 9:49 p.m.