Triple

T26025311
Position Surface form Disambiguated ID Type / Status
Subject Allon Plan E647273 entity
Predicate instanceOf P0 FINISHED
Object post-1967 peace plan C10715 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: post-1967 peace plan
Context triple: [Allon Plan, instanceOf, post-1967 peace plan]
  • A. post–Yom Kippur War diplomacy
    Post–Yom Kippur War diplomacy refers to the series of negotiations, shuttle missions, and agreements among Israel, Egypt, Syria, the United States, and other actors after the 1973 war that reshaped Middle Eastern borders, security arrangements, and great-power influence in the region.
  • B. peace settlement
    A peace settlement is a formal agreement between conflicting parties that ends hostilities and establishes terms for lasting resolution and post-conflict relations.
  • C. Arab–Israeli conflict
    The Arab–Israeli conflict is a long-standing political, territorial, and ideological struggle between Israel and various Arab states and Palestinian groups, centered on competing national claims to the land between the Jordan River and the Mediterranean Sea.
  • D. peace proposal chosen
    A peace proposal is a formal plan or set of terms presented to conflicting parties with the aim of resolving disputes and establishing lasting harmony.
  • E. period of peace
    A period of peace is a span of time during which societies or groups experience the absence of war and significant conflict, allowing for stability, recovery, and cooperative development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8b60e88190a3b26c4f0032a2c2 completed April 21, 2026, 1:41 p.m.
Created at: April 22, 2026, 9:05 a.m.