Triple

T26019225
Position Surface form Disambiguated ID Type / Status
Subject Sungai Johor Bridge E647110 entity
Predicate instanceOf P0 FINISHED
Object bridge in Malaysia C50458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge in Malaysia
Context triple: [Sungai Johor Bridge, instanceOf, bridge in Malaysia]
  • A. bridge in Indonesia
    A bridge in Indonesia is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Indonesian territory to facilitate transportation and connectivity between regions.
  • B. bridge in Thailand
    A bridge in Thailand is a structural crossing—ranging from modern cable-stayed spans to traditional concrete or steel structures—designed to connect regions over rivers, roads, or valleys within the Thai landscape and infrastructure network.
  • C. bridge in Taiwan
    A bridge in Taiwan is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Taiwan’s territory to provide transportation routes for vehicles, pedestrians, or railways.
  • D. bridge in the Philippines
    A bridge in the Philippines is a man-made structure that spans physical obstacles such as bodies of water, valleys, or roads within the Philippine archipelago to facilitate transportation and connectivity between different areas.
  • E. bridge in Vietnam
    A bridge in Vietnam is a structural crossing—ranging from historic colonial-era spans to modern cable-stayed icons—that connects regions over rivers, deltas, or urban waterways, supporting transportation, trade, and tourism within the country’s diverse landscapes.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8aa65881909ca58918f29ab2a0 completed April 21, 2026, 1:41 p.m.
Created at: April 22, 2026, 9:03 a.m.