Triple

T26004739
Position Surface form Disambiguated ID Type / Status
Subject Big Brutus E646727 entity
Predicate instanceOf P0 FINISHED
Object dragline excavator C37599 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dragline excavator
Context triple: [Big Brutus, instanceOf, dragline excavator]
  • A. dump truck
    A dump truck is a heavy-duty vehicle with an open-box bed hinged at the rear, designed to transport and unload loose materials like sand, gravel, or demolition waste by lifting the front of the bed to dump its contents.
  • B. tunnel boring machine
    A tunnel boring machine is a large, specialized mechanical device used to excavate tunnels through soil and rock by cutting, removing, and transporting material while simultaneously supporting the tunnel face.
  • C. crane chosen
    A crane is a large, tall machine equipped with hoists, cables, and pulleys used to lift and move heavy materials in construction, manufacturing, and shipping operations.
  • D. cantilever crane
    A cantilever crane is a lifting device with a horizontal beam fixed at one end and projecting outward to support loads without additional vertical support at the free end.
  • E. aerial lift
    An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e89d5848190b54352cdb74f6029 completed April 21, 2026, 1:41 p.m.
Created at: April 22, 2026, 9 a.m.