Triple
T25990493
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Klemetsrud waste-to-energy plant |
E646335
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waste-to-energy plant |
C4822
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waste-to-energy plant Context triple: [Klemetsrud waste-to-energy plant, instanceOf, waste-to-energy plant]
-
A.
radioactive waste processing facility
A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
-
B.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
C.
industrial waste site
An industrial waste site is a designated area where byproducts, residues, and discarded materials from industrial processes are stored, treated, or disposed of, often requiring specialized management to prevent environmental contamination.
-
D.
industrial plant
chosen
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
E.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e77e88cb8481908da31d4a00661f55 |
completed | April 21, 2026, 1:41 p.m. |
Created at: April 22, 2026, 8:57 a.m.