Triple
T25945519
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | United Nations Security Council Resolution 819 |
E653828
|
entity |
| Predicate | implementationBody |
P160957
|
FINISHED |
| Object | United Nations Protection Force |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: United Nations Protection Force | Statement: [United Nations Security Council Resolution 819, implementationBody, United Nations Protection Force]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: implementationBody Context triple: [United Nations Security Council Resolution 819, implementationBody, United Nations Protection Force]
-
A.
componentBody
Indicates that one entity functions as a physical or logical part of the main body or structure of another entity.
-
B.
executionOfBody
Indicates that an action or process involves carrying out, performing, or running the specified body (e.g., a body of code, procedure, or content).
-
C.
implementationType
Indicates the specific manner or approach by which something is implemented or realized in practice.
-
D.
implementationEnd
Indicates the point in time or condition at which an implementation process, activity, or phase is considered complete.
-
E.
implementationStart
Indicates the point in time or event at which the implementation of something (such as a plan, system, or project) begins.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab40ac788190a771bc499eb1ae5f |
completed | April 21, 2026, 4:52 p.m. |
| NER | Named-entity recognition | batch_69f60dfaeebc8190ac01d3a0030acf55 |
completed | May 2, 2026, 2:45 p.m. |
| PD | Predicate disambiguation | batch_69f60b874cc88190a487230abb69efea |
completed | May 2, 2026, 2:34 p.m. |
| PDg | Predicate description generation | batch_69f60c68b02c8190870758d79cdec68b |
completed | May 2, 2026, 2:38 p.m. |
Created at: April 22, 2026, 8:43 a.m.