Triple

T25923504
Position Surface form Disambiguated ID Type / Status
Subject Brankov most E653237 entity
Predicate instanceOf P0 FINISHED
Object bridge over the Sava River C50090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge over the Sava River
Context triple: [Brankov most, instanceOf, bridge over the Sava River]
  • A. bridge in Croatia
    A bridge in Croatia is a structural crossing—such as a road, rail, or pedestrian span—located within Croatian territory, designed to connect separated land areas over obstacles like water, valleys, or other infrastructure.
  • B. Ottoman bridge
    An Ottoman bridge is a stone or masonry arch bridge built during the Ottoman Empire, typically featuring elegant arches, narrow decks, and often serving as both a transportation route and a social or commercial gathering space.
  • C. bridge over the Main
    A bridge over the Main is a structural crossing that spans the Main River to connect its opposite banks for transportation and passage.
  • D. разводной мост
    Разводной мост — это мостовая конструкция с подвижными пролетами, которые могут подниматься или раздвигаться для пропуска судов по водному пути.
  • E. bridge in Venice
    A bridge in Venice is an architectural structure spanning the city’s canals, enabling pedestrian movement between separated land areas while often serving as a historic and cultural landmark.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab3eb9b881909c1390690551f868 completed April 21, 2026, 4:52 p.m.
Created at: April 22, 2026, 8:35 a.m.