Triple
T25913528
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Port Authority Building, Antwerp |
E652963
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | port authority building |
C2681
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: port authority building Context triple: [Port Authority Building, Antwerp, instanceOf, port authority building]
-
A.
port authority
chosen
A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
-
B.
port area
A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
-
C.
river pier
A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
-
D.
gateway tower
A gateway tower is a tall, often monumental structure that marks and controls entry to a defined area, serving both as a passage point and a visual landmark.
-
E.
airport authority
An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab3e025c819086771607157f0015 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 8:30 a.m.