Triple

T25893756
Position Surface form Disambiguated ID Type / Status
Subject Karasuma Station E652404 entity
Predicate electrificationOfLineServed P122334 FINISHED
Object DC 1500 V overhead catenary LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: DC 1500 V overhead catenary | Statement: [Karasuma Station, electrificationOfLineServed, DC 1500 V overhead catenary]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationOfLineServed
Context triple: [Karasuma Station, electrificationOfLineServed, DC 1500 V overhead catenary]
  • A. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • B. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • C. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • D. numberOfElectrifiedLines
    Indicates the quantity of railway or transit lines within a system or network that are equipped with electrical power infrastructure for operation.
  • E. electrificationUsedBy chosen
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab3c6cc081908de59bfcc28ec19d completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f6cee45590819086e489bfccbe4ac3 completed May 3, 2026, 4:28 a.m.
PD Predicate disambiguation batch_69f6cc1188708190b8f0f56e595e6057 completed May 3, 2026, 4:16 a.m.
Created at: April 22, 2026, 8:22 a.m.