Triple
T25885339
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Despicable Me: Minion Mayhem in 4D |
E652171
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 4D cinema attraction |
C27262
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 4D cinema attraction Context triple: [Despicable Me: Minion Mayhem in 4D, instanceOf, 4D cinema attraction]
-
A.
3D motion-based ride
A 3D motion-based ride is an immersive attraction that synchronizes moving seats or ride vehicles with 3D visual media, sound, and special effects to simulate dynamic, realistic motion experiences.
-
B.
motion simulator ride
A motion simulator ride is an amusement attraction that uses synchronized moving platforms, visual displays, and sound effects to create the immersive illusion of traveling through dynamic environments.
-
C.
entertainment complex
An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
-
D.
cinema apparatus
A cinema apparatus is the integrated system of technologies, practices, and viewing conditions that together produce and structure the experience of watching films.
-
E.
film-related attraction
chosen
A film-related attraction is a location, exhibit, or experience designed to engage visitors with movies or television through sets, props, screenings, interactive elements, or behind-the-scenes insights.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab3b92cc81908febd90317862647 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 8:17 a.m.