Triple
T25856058
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New York City Transit rail yard network |
E651346
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail yard network |
C35874
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail yard network Context triple: [New York City Transit rail yard network, instanceOf, rail yard network]
-
A.
railroad classification yard
A railroad classification yard is a specialized rail facility where freight cars are sorted, assembled, and dispatched into new trains based on their destinations.
-
B.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
C.
freight railroad network
A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
-
D.
rail transportation infrastructure
Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
-
E.
railroad facility
chosen
A railroad facility is a dedicated site or complex that supports the operation, maintenance, management, or interchange of trains and rail infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab39035c8190be15c8aaee1bb858 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 8 a.m.