Triple

T25842518
Position Surface form Disambiguated ID Type / Status
Subject SEA 1180 Phase 1 E650974 entity
Predicate instanceOf P0 FINISHED
Object Royal Australian Navy procurement project C50788 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Royal Australian Navy procurement project
Context triple: [SEA 1180 Phase 1, instanceOf, Royal Australian Navy procurement project]
  • A. Royal Australian Navy warship
    A Royal Australian Navy warship is a commissioned naval vessel operated by Australia’s maritime defense force, designed and equipped for roles such as combat, patrol, escort, surveillance, and support in national and allied operations.
  • B. Royal Navy programme
    A Royal Navy programme is an organized initiative or plan undertaken by the Royal Navy to develop, maintain, or enhance its capabilities, operations, personnel, or infrastructure over a defined period.
  • C. Royal Australian Navy formation
    A Royal Australian Navy formation is an organized grouping of naval vessels, units, or personnel structured for operational, administrative, or ceremonial purposes within the Royal Australian Navy.
  • D. Anzac-class frigate
    The Anzac-class frigate is a class of modern, multi-role warships operated by the Royal Australian Navy and Royal New Zealand Navy, designed primarily for anti-submarine and anti-surface warfare, as well as air defense and patrol duties.
  • E. Royal Australian Navy shore establishment
    A Royal Australian Navy shore establishment is a land-based facility that supports naval operations through administration, training, logistics, maintenance, and other essential services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab38086081908f3a8e7e0c6efd83 completed April 21, 2026, 4:52 p.m.
Created at: April 22, 2026, 7:50 a.m.