Triple

T25821518
Position Surface form Disambiguated ID Type / Status
Subject Bocaue Toll Plaza E650415 entity
Predicate isAlongCorridor P85888 FINISHED
Object Manila–North Luzon transport corridor NE NERFINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Manila–North Luzon transport corridor | Statement: [Bocaue Toll Plaza, isAlongCorridor, Manila–North Luzon transport corridor]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab367fcc8190a5ff1e7f3da046a4 completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f60191786c81908ee95f5d74dfe98a completed May 2, 2026, 1:52 p.m.
Created at: April 22, 2026, 7:29 a.m.