Triple

T25819077
Position Surface form Disambiguated ID Type / Status
Subject Shire River basin E650347 entity
Predicate containsHydropowerPlantOnMainRiver P15311 FINISHED
Object Nkula Falls hydropower station NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nkula Falls hydropower station | Statement: [Shire River basin, containsHydropowerPlantOnMainRiver, Nkula Falls hydropower station]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: containsHydropowerPlantOnMainRiver
Context triple: [Shire River basin, containsHydropowerPlantOnMainRiver, Nkula Falls hydropower station]
  • A. hasHydropowerRoleIn
    Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
  • B. hasMajorHydroSystem
    Indicates that an entity possesses or is associated with a primary or significant hydrological system, such as a major river, watershed, or water network.
  • C. hasHydroelectricInfrastructureNearby
    Indicates that there is hydroelectric infrastructure located in close proximity to the referenced entity.
  • D. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • E. hasHydroelectricProject chosen
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab367fcc8190a5ff1e7f3da046a4 completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f71f8ee0688190bd025f27993452d3 completed May 3, 2026, 10:12 a.m.
PD Predicate disambiguation batch_69f71cc405c08190863565609a4c8499 completed May 3, 2026, 10 a.m.
Created at: April 22, 2026, 7:28 a.m.