Triple
T25819077
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shire River basin |
E650347
|
entity |
| Predicate | containsHydropowerPlantOnMainRiver |
P15311
|
FINISHED |
| Object | Nkula Falls hydropower station |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nkula Falls hydropower station | Statement: [Shire River basin, containsHydropowerPlantOnMainRiver, Nkula Falls hydropower station]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: containsHydropowerPlantOnMainRiver Context triple: [Shire River basin, containsHydropowerPlantOnMainRiver, Nkula Falls hydropower station]
-
A.
hasHydropowerRoleIn
Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
-
B.
hasMajorHydroSystem
Indicates that an entity possesses or is associated with a primary or significant hydrological system, such as a major river, watershed, or water network.
-
C.
hasHydroelectricInfrastructureNearby
Indicates that there is hydroelectric infrastructure located in close proximity to the referenced entity.
-
D.
isHydroelectricProjectOn
Indicates that a hydroelectric project is located on or situated along a specified water body or site.
-
E.
hasHydroelectricProject
chosen
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab367fcc8190a5ff1e7f3da046a4 |
completed | April 21, 2026, 4:52 p.m. |
| NER | Named-entity recognition | batch_69f71f8ee0688190bd025f27993452d3 |
completed | May 3, 2026, 10:12 a.m. |
| PD | Predicate disambiguation | batch_69f71cc405c08190863565609a4c8499 |
completed | May 3, 2026, 10 a.m. |
Created at: April 22, 2026, 7:28 a.m.