Triple
T25794679
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | former New York, New Haven and Hartford Railroad corridors |
E649647
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail trail corridor network |
C15867
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail trail corridor network Context triple: [former New York, New Haven and Hartford Railroad corridors, instanceOf, rail trail corridor network]
-
A.
rail trail
A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
-
B.
trail system
chosen
A trail system is an interconnected network of designated paths and routes designed to guide users through natural or built environments for recreation, transportation, or exploration.
-
C.
recreation trail
A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
-
D.
freight rail corridor
A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
-
E.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab34f8c8819099f6c4dabdabf129 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 6:28 a.m.