Triple

T25791384
Position Surface form Disambiguated ID Type / Status
Subject Presidency of James A. Garfield E649555 entity
Predicate completedFullTerm P162602 FINISHED
Object false LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: false | Statement: [Presidency of James A. Garfield, completedFullTerm, false]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: completedFullTerm
Context triple: [Presidency of James A. Garfield, completedFullTerm, false]
  • A. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • B. completedAfter
    Indicates that one event or task was finished at a later time than another specified event or task.
  • C. completionOf
    Indicates that one entity represents the finished state, fulfillment, or successful conclusion of another entity, process, or requirement.
  • D. completedBefore
    Indicates that one event or action was fully completed prior to the start or completion of another specified event or action.
  • E. termFilled
    Indicates that a specific term, field, or placeholder has been completed or populated with a value.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab33e9308190afe415dc6f9e8876 completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f62b9e5ba88190a3c0d46edec7afe7 completed May 2, 2026, 4:51 p.m.
PD Predicate disambiguation batch_69f623a4e1048190bbb8dd1253fdcee9 completed May 2, 2026, 4:17 p.m.
PDg Predicate description generation batch_69f627ad6d4c81909796d39d78e414f9 completed May 2, 2026, 4:34 p.m.
Created at: April 22, 2026, 5:59 a.m.