Triple
T25786232
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Block VII |
E649424
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | future naval vessel production batch |
C6102
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: future naval vessel production batch Context triple: [Block VII, instanceOf, future naval vessel production batch]
-
A.
naval shipbuilding program
A naval shipbuilding program is an organized, long-term initiative to design, construct, and deliver warships and support vessels to meet a navy’s strategic, operational, and technological requirements.
-
B.
shipbuilder
A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
-
C.
planned warship class
chosen
A planned warship class is a group of naval vessels of the same general design that are proposed or under development but not yet built or commissioned.
-
D.
commissioned vessel
A commissioned vessel is a ship or boat that has been formally placed into active service by an authorized organization, typically a navy or government agency, under an official commission.
-
E.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab33e9308190afe415dc6f9e8876 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 5:55 a.m.