Triple

T25785953
Position Surface form Disambiguated ID Type / Status
Subject SSN(X)-class submarine E649417 entity
Predicate plannedToSucceed P43223 FINISHED
Object Virginia-class submarine NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Virginia-class submarine | Statement: [SSN(X)-class submarine, plannedToSucceed, Virginia-class submarine]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedToSucceed
Context triple: [SSN(X)-class submarine, plannedToSucceed, Virginia-class submarine]
  • A. planned
    Indicates that an entity has intentionally arranged or scheduled another entity or event to occur in the future.
  • B. maySucceed
    Indicates that one entity has the potential or possibility to follow or replace another in a role, position, or sequence.
  • C. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • D. succeedsTo chosen
    Indicates that one entity takes over a role, position, or function previously held by another entity, following it in sequence or authority.
  • E. plannedWith
    Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab33e9308190afe415dc6f9e8876 completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f6352fdb788190b9bad30243690743 completed May 2, 2026, 5:32 p.m.
PD Predicate disambiguation batch_69f63182f1408190bddc1214fcbd6145 completed May 2, 2026, 5:16 p.m.
Created at: April 22, 2026, 5:54 a.m.