Triple

T257780
Position Surface form Disambiguated ID Type / Status
Subject Tappan Zee Bridge E5473 entity
Predicate instanceOf P0 FINISHED
Object cantilever bridge C2689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cantilever bridge
Context triple: [Tappan Zee Bridge, instanceOf, cantilever bridge]
  • A. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • B. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • C. highway bridge
    A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
  • D. ceremonial bridge
    A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
  • E. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2580a64ac8190ad76e34bb0715b5e completed Feb. 28, 2026, 2:50 a.m.
Created at: Feb. 28, 2026, 2:55 a.m.