Triple

T25764486
Position Surface form Disambiguated ID Type / Status
Subject Kirby Building E648841 entity
Predicate instanceOf P0 FINISHED
Object loft apartment building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: loft apartment building
Context triple: [Kirby Building, instanceOf, loft apartment building]
  • A. high‑rise building
    A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
  • B. floor of a building
    A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
  • C. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • D. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • E. real estate complex
    A real estate complex is a group of buildings and associated land, planned and developed as a unified property for residential, commercial, or mixed-use purposes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab322db0819092d6a2b3d4572e01 completed April 21, 2026, 4:52 p.m.
Created at: April 22, 2026, 5:09 a.m.