Triple
T25755778
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Juneau-Douglas Bridge |
E648592
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Alaska |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Alaska Context triple: [Juneau-Douglas Bridge, instanceOf, bridge in Alaska]
-
A.
bridge in Seattle
A bridge in Seattle is a structural crossing—often spanning water or valleys—that connects different parts of the city or region, accommodating vehicles, pedestrians, and sometimes rail while withstanding the Pacific Northwest’s climate and seismic conditions.
-
B.
river bridge
chosen
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
C.
교량
교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
-
D.
granite bridge
A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
-
E.
Alaska Marine Highway route
An Alaska Marine Highway route is a designated ferry corridor within the Alaska Marine Highway System that connects specific coastal communities and ports according to a defined schedule and service pattern.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab314d788190b3abe19e114080e1 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 4:40 a.m.