Triple
T25750295
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lunar Prospector |
E648453
|
entity |
| Predicate | missionTermination |
P41474
|
FINISHED |
| Object | deliberate impact into lunar surface |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: deliberate impact into lunar surface | Statement: [Lunar Prospector, missionTermination, deliberate impact into lunar surface]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: missionTermination Context triple: [Lunar Prospector, missionTermination, deliberate impact into lunar surface]
-
A.
missionEnd
chosen
Indicates that a mission has concluded or reached its final state or outcome.
-
B.
terminationMechanism
Indicates the process or method by which an ongoing state, activity, or relationship is brought to an end.
-
C.
terminationEndedIn
Indicates that a termination event concluded with a specific outcome or result.
-
D.
missionFailure
Indicates that an attempted mission or operation did not achieve its intended objectives or outcome.
-
E.
wasTerminated
Indicates that an entity’s employment, contract, or ongoing role was ended, typically by a decision from another party rather than by the entity itself.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab314d788190b3abe19e114080e1 |
completed | April 21, 2026, 4:52 p.m. |
| NER | Named-entity recognition | batch_69f5fd7df2ac8190a206646c8640cec0 |
completed | May 2, 2026, 1:34 p.m. |
| PD | Predicate disambiguation | batch_69f4a0fed15881909b789251fe5d8d45 |
completed | May 1, 2026, 12:47 p.m. |
Created at: April 22, 2026, 4:33 a.m.