Triple
T25749647
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | statue of William IV |
E648439
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned equestrian statue |
C50740
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned equestrian statue Context triple: [statue of William IV, instanceOf, planned equestrian statue]
-
A.
equestrian-free commemorative monument
An equestrian-free commemorative monument is a public structure or sculpture designed to honor a person, event, or idea without featuring a mounted rider or horse, instead using alternative symbolic forms or figures.
-
B.
double statue
A double statue is a sculptural artwork depicting two figures, often positioned together to convey a relationship, interaction, or thematic connection between them.
-
C.
colossal statue
A colossal statue is an enormous, often monumental sculptural representation of a figure, typically created to commemorate, symbolize, or glorify a person, deity, or idea.
-
D.
bronze monument
A bronze monument is a large, durable commemorative structure cast or constructed primarily from bronze to honor a person, event, or idea in a public or significant space.
-
E.
life-size statue
A life-size statue is a three-dimensional representation of a person, animal, or figure created at the same scale as its real-world counterpart.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab314d788190b3abe19e114080e1 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 4:33 a.m.