Triple
T25741689
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Intel 7 |
E648234
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | semiconductor process node |
C24281
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: semiconductor process node Context triple: [Intel 7, instanceOf, semiconductor process node]
-
A.
semiconductor manufacturing process
chosen
The semiconductor manufacturing process is a highly controlled, multi-step sequence of fabrication, patterning, doping, and layering operations used to transform raw silicon wafers into functional integrated circuits and microchips.
-
B.
semiconductor manufacturing facility
A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
-
C.
integrated circuit technology
Integrated circuit technology is the design and fabrication of miniaturized electronic circuits on semiconductor chips, enabling complex, high-speed, and low-power electronic systems.
-
D.
computer chip
A computer chip is a small, integrated electronic circuit composed of microscopic components that processes and stores data to perform computational tasks within electronic devices.
-
E.
microelectronics technology
Microelectronics technology is the field focused on designing, fabricating, and integrating extremely small electronic components and circuits—such as transistors, diodes, and integrated circuits—on semiconductor substrates to enable compact, high-performance electronic systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab306eec8190b05c312c6ab186b8 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 3:45 a.m.