Triple

T2572355
Position Surface form Disambiguated ID Type / Status
Subject Intermediate Capacity Transit System E57692 entity
Predicate capacityRelativeTo P31373 FINISHED
Object higher than street-level light rail LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: higher than street-level light rail | Statement: [Intermediate Capacity Transit System, capacityRelativeTo, higher than street-level light rail]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: capacityRelativeTo
Context triple: [Intermediate Capacity Transit System, capacityRelativeTo, higher than street-level light rail]
  • A. capacityCategory
    Indicates the classification of something based on the amount or volume it can hold, handle, or accommodate.
  • B. capacityRank chosen
    Indicates the relative ordering of entities based on how much capacity (e.g., volume, throughput, or capability) they possess compared to others.
  • C. typicalCapacity
    Indicates the usual or standard amount, volume, or capability that something is designed or expected to hold, handle, or perform under normal conditions.
  • D. installedCapacity
    Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
  • E. totalCapacity
    Indicates the maximum amount or volume that something can hold or accommodate in total.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a51410081908501dcf8bad9adc4 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd3853c848190970e8a2da16d726d completed March 7, 2026, 7:28 a.m.
PD Predicate disambiguation batch_69abd0ce4dcc8190b17a65abf9bd1bb0 completed March 7, 2026, 7:16 a.m.
Created at: March 6, 2026, 9:48 p.m.