Triple

T25723257
Position Surface form Disambiguated ID Type / Status
Subject USPHS O-7 E645045 entity
Predicate isLineOrStaff P159493 FINISHED
Object staff corps–type rank LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: staff corps–type rank | Statement: [USPHS O-7, isLineOrStaff, staff corps–type rank]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isLineOrStaff
Context triple: [USPHS O-7, isLineOrStaff, staff corps–type rank]
  • A. isLinedWith
    Indicates that one object or surface is covered, edged, or internally coated along its length or area with another material or layer.
  • B. usesInterpretiveStaff
    Indicates that an entity relies on interpretive staff (such as guides, educators, or docents) to convey information, context, or explanations about something to an audience.
  • C. partOfBandLineup
    Indicates that an entity is a member of, or included in, the lineup of a particular band.
  • D. numberOfStaves
    Indicates the quantity of staves associated with or contained in a given entity.
  • E. isBusyLine
    Indicates that a communication line or channel is currently in use and cannot accept additional connections or calls.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8476fc8190bd5e9d05b89fad0a completed April 21, 2026, 1:41 p.m.
NER Named-entity recognition batch_69f5fc683cd48190bf4bab9cb8de691a completed May 2, 2026, 1:30 p.m.
PD Predicate disambiguation batch_69f4a0f7c6008190ae8cee3e71e19b94 completed May 1, 2026, 12:47 p.m.
PDg Predicate description generation batch_69f55e497fa081909bc59a7b92c5df59 completed May 2, 2026, 2:15 a.m.
Created at: April 21, 2026, 10:07 p.m.