Triple

T25721132
Position Surface form Disambiguated ID Type / Status
Subject National Highways Development Project E644997 entity
Predicate instanceOf P0 FINISHED
Object road construction programme C14043 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road construction programme
Context triple: [National Highways Development Project, instanceOf, road construction programme]
  • A. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • C. road safety program
    A road safety program is an organized set of policies, education, engineering measures, and enforcement activities designed to prevent traffic accidents and reduce injuries and fatalities on roadways.
  • D. public transit and highway improvement program chosen
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • E. road construction company
    A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8476fc8190bd5e9d05b89fad0a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 9:59 p.m.