Triple
T25717443
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ENTSO-E |
E644898
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transmission system operator network |
C7916
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transmission system operator network Context triple: [ENTSO-E, instanceOf, transmission system operator network]
-
A.
regional transmission organization
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
-
B.
national grid system
A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
-
C.
power system
chosen
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
D.
television network operator
A television network operator is an organization that manages, schedules, and distributes television programming across broadcast, cable, satellite, or digital platforms to reach viewers.
-
E.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e77e8476fc8190bd5e9d05b89fad0a |
completed | April 21, 2026, 1:41 p.m. |
Created at: April 21, 2026, 9:46 p.m.