Triple

T25704388
Position Surface form Disambiguated ID Type / Status
Subject Book II (Joseph Andrews) E644546 entity
Predicate numberOfPartsInWork P97683 FINISHED
Object 4 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 4 | Statement: [Book II (Joseph Andrews), numberOfPartsInWork, 4]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: numberOfPartsInWork
Context triple: [Book II (Joseph Andrews), numberOfPartsInWork, 4]
  • A. numberOfCompletedParts
    Indicates the count of parts within a whole that have been finished or fully completed.
  • B. hasNumberOfPartsInWholeWork chosen
    Indicates that an entity specifies how many component parts are contained within a complete work.
  • C. hasWorkPart
    Indicates that one work is a component, section, or constituent part of another, larger work.
  • D. materialWorked
    Indicates that an agent performs work or processing on a specified material.
  • E. partOfWorkType
    Indicates that something is a component, subtype, or specific category within a broader type of work.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e83c8ec8190bf52fcdac4838984 completed April 21, 2026, 1:41 p.m.
NER Named-entity recognition batch_69fbaebc8f2c8190b94f1b4a3ec92e8c completed May 6, 2026, 9:12 p.m.
PD Predicate disambiguation batch_69fbadf1e6008190a71bbd196ba06844 completed May 6, 2026, 9:09 p.m.
Created at: April 21, 2026, 9:01 p.m.