Triple

T25698183
Position Surface form Disambiguated ID Type / Status
Subject North Shore railway line E644383 entity
Predicate openedForElectricTrains P94567 FINISHED
Object 20th century LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 20th century | Statement: [North Shore railway line, openedForElectricTrains, 20th century]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: openedForElectricTrains
Context triple: [North Shore railway line, openedForElectricTrains, 20th century]
  • A. openedAsElectrifiedRoute
    Indicates that a transportation route was inaugurated already equipped with electrification, rather than being electrified at a later time.
  • B. isElectricRailway
    Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
  • C. railElectrificationIncludes chosen
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • D. openedToRailTraffic
    Indicates that a rail line, track, or related infrastructure has begun operating and is officially available for use by train traffic.
  • E. openedAsTramway
    Indicates that a transportation line or route was originally inaugurated and operated as a tramway system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e82c9bc8190893090b2f6c64f1d completed April 21, 2026, 1:41 p.m.
NER Named-entity recognition batch_69f63fd6c68481908c542aa03e297b9c completed May 2, 2026, 6:17 p.m.
PD Predicate disambiguation batch_69f63c6456608190b94e7c2e2c2a4824 completed May 2, 2026, 6:03 p.m.
Created at: April 21, 2026, 8:40 p.m.