Triple

T2568867
Position Surface form Disambiguated ID Type / Status
Subject Symphony No. 5 in C minor, Op. 67 E57616 entity
Predicate finalMovementKey P40257 FINISHED
Object C major LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: C major | Statement: [Symphony No. 5 in C minor, Op. 67, finalMovementKey, C major]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalMovementKey
Context triple: [Symphony No. 5 in C minor, Op. 67, finalMovementKey, C major]
  • A. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • B. finalSceneAction
    Indicates the action or event that occurs in the concluding or final scene of a narrative or sequence.
  • C. finalHomeOf
    Indicates that a location is the last or ultimate home, residence, or resting place of an entity.
  • D. finalMissionOf
    Indicates that one entity is the last mission, assignment, or operation undertaken by another entity.
  • E. finalMissionPhase
    Indicates that an entity is in, or corresponds to, the concluding or last phase of a mission.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a51410081908501dcf8bad9adc4 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd380d6e081909c124e8a0b7feef3 completed March 7, 2026, 7:28 a.m.
PD Predicate disambiguation batch_69abd0cc8d308190ae7aa32b8f5ae2e5 completed March 7, 2026, 7:16 a.m.
PDg Predicate description generation batch_69abd1aa13a08190a8757c017d8a2478 completed March 7, 2026, 7:20 a.m.
Created at: March 6, 2026, 9:48 p.m.