Triple

T25686308
Position Surface form Disambiguated ID Type / Status
Subject National Highways Accident Relief Service Scheme E644075 entity
Predicate instanceOf P0 FINISHED
Object road safety scheme C27439 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road safety scheme
Context triple: [National Highways Accident Relief Service Scheme, instanceOf, road safety scheme]
  • A. road safety program chosen
    A road safety program is an organized set of policies, education, engineering measures, and enforcement activities designed to prevent traffic accidents and reduce injuries and fatalities on roadways.
  • B. road safety device
    A road safety device is an object or system installed on or near roadways to prevent accidents, guide traffic, and protect road users from harm.
  • C. roadway safety guideline
    A roadway safety guideline is a documented set of principles, rules, and recommended practices designed to minimize traffic-related risks and enhance the safety of all road users.
  • D. road traffic agreement
    A road traffic agreement is a formal arrangement between parties—such as governments, municipalities, or private entities—that defines rights, responsibilities, and rules for the use, management, and regulation of road traffic within a specified area or network.
  • E. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8046888190b07ffa58c7e2c37a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 8:09 p.m.