Triple
T25686112
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bharatmala Pariyojana |
E644071
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | highway development programme |
C14043
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: highway development programme Context triple: [Bharatmala Pariyojana, instanceOf, highway development programme]
-
A.
public transit and highway improvement program
chosen
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
-
B.
highway funding program
A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
-
C.
toll road project
A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
-
D.
highway system
A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
-
E.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e77e8046888190b07ffa58c7e2c37a |
completed | April 21, 2026, 1:41 p.m. |
Created at: April 21, 2026, 8:09 p.m.